400 All new stormwater drainage facilities on site shall be designed for free flow at a 10-year, twenty-four-hour storm event. The design of all permanent structural facilities (pipes, structures, channels, ponds, etc.) shall be based on post development flow. |
(Ord. of 6-18-92) |